Equipment Installation, Testing & Configuration
Installation consists of unpacking and installing all equipment piece-by-piece per the engineering drawings. Components are installed in racks according to rack elevations; installing any required rack sliders, shelving, and drawers; erecting all related furniture; mounting all monitors; hanging light grids and lights; and finally, configuring and preparing equipment for testing.
Testing is a thorough process using an in-depth checklist. Every function, feature, and I/O is tested on each piece of equipment before commissioning begins.
To complete testing, a final live, in-depth run-through is conducted with your technical team, followed by a total system shake down to load and stress test the system.