Request a Quote

877.761.9770

IMT selected as one of the top 500 companies in the US.

Broadcast Facility and Studio Moves & Upgrades

For most managers, the thought of moving a broadcast facility is daunting. IMT takes the stress and concern out of the move. With several facility relocation projects under our belt, such as Time Warner’s production studio, PR Newswire’s post facility, and a JLTV broadcast facility, we understand the myriad tasks required. Sitting down with your team, we develop a plan that fits your moving schedule, meets your occupancy date, and allows for limited to zero downtime of your broadcast, production, or post operations.

841In the typical facility move, we first design, engineer, and wire the new facility. The move may allow us to suggest improvements to your workflow and plan for future upgrades. Then, at the old facility we inventory, decommission, and package all the equipment into crates. We move the crates to the new facility and begin commissioning. Once everything is up and running, we coach your team on the operations of the new facility.

Besides relocations, clients use our “A Team” for upgrades or expansions including HD, digital, tapeless, or improved workflow upgrades. In these scenarios our team creates a plan to accomplish the upgrade or expansion while utilizing existing infrastructure and without disrupting current operations.

To learn more about our Broadcast Studio Move/Upgrade Services, simply click here to Request a Free Broadcast Studio Move Consultation or give our Integration Sales Team a call.

CALL US: 877.761.9770

Copyright © 2012 IMT Inc.    All Rights Reserved